Preventive Schedule Configuration
To create a preventive maintenance schedule, follow the steps outlined below.1
Enter the building level
From the portfolio-level, navigate to the Buildings section and select a building.
2
Navigate to Schedules
Navigate to the Schedules section in the building-level sidebar.
3
Create Schedule
To create a new schedule click the
+ Create button.Select Preventive Maintenance as the work type and click Continue.4
Configure General Information
Configure the required general information fields.
5
Configure Scheduling Details
Configure the required scheduling details.
- Type - Just Once
- Type - Recurrent
- Type - On Demand
6
Assign Assets
You can assign assets to a schedule by type or by list.
- Asset Type – Includes all assets of that type in the schedule automatically.
- Asset List – Allows you to select specific assets from the chosen type.
7
Assign Tasks
Assign predefined task templates for the schedule.You can select one or more task templates based on your schedule needs.
8
Finalize
Lastly, click
Complete to create the schedule.
